AAM Driveline: one roof, two readings.
Thermal imaging compared a Bitum-coated area with an uncoated area of the same industrial roof at the same moment.

Adalio case studies
Measurements describe surface temperature under defined conditions. Project records show where IzolPLUS and IzolGLASS have been used and link to the available evidence.
Project index
A measurement and an application record are different forms of evidence. Each project page states the available source and conditions.
Thermal imaging compared a Bitum-coated area with an uncoated area of the same industrial roof at the same moment.

Application of IzolGLASS Active TT film on the window glazing of a heritage manor house. Window joinery replacement ruled out by conservation requirements. Contractor and owner - Sławomir Włoszczak, president of BOTI-CEL.
Revitalization of roof covering under public procurement. Thin-Layer Hydro-Thermal Insulation System - 2 layers of compound plus 2 layers of IzolPLUS Bitum paint on roofing felt.
Insulation of steam pipelines, heat substations, valves and fittings with IzolPLUS Termo Stop compound in the district heating networks of two operators. Adalio reference projects.
IzolPLUS coating on both sides (Termo-Fasada on the front facade, Termo-Wnętrze inside) without ETICS and without replacing joinery. Modernization confirmed by the Heritage Conservator.
Comprehensive improvement of the energy efficiency of the Łazarski University building in Warsaw using IzolPLUS thermoreflective paints on facades, roofs and internal surfaces.
Full IzolPLUS system during a major renovation of a heritage church - Termo-Fasada and Termo-Wnętrze paints plus thermal insulation compound. Over 3,000 litres of material. Window joinery replacement ruled out by conservation requirements.
Two-sided IzolPLUS coating (Termo-Fasada outside, Termo-Wnętrze inside) on a 0.4 m brick wall without insulation. Comparative gas consumption measurement over two heating seasons. Analysis by Dr Eng. Grzegorz Kaczmarzyk.
Evidence standard
The situation before the work, without figures unsupported by a measurement or document.
The product, surface and relevant application conditions.
Values, units, date, ambient temperature, method and equipment.
A benefit that follows directly from the measurement or a documented client observation.
Building assessment